Temporary and definitive connection: construction of the user substation (Power 28,5 MW) and the HV connection cable in cable duct and controlled horizontal drilling (MV section with voltage equal to 20kv and an HV section with voltage equal to 150kv
Client
Acea Solar
Location
Licodia, Sicily, Italy
Category
Construction
Architect
Simone Turnone
Year Completed
2023-24