Connection: construction of the user substation

Temporary and definitive connection: construction of the user substation (Power 28,5 MW) and the HV connection cable in cable duct and controlled horizontal drilling (MV section with voltage equal to 20kv and an HV section with voltage equal to 150kv

Client
Acea Solar

Location

Licodia, Sicily, Italy

Category

Construction

Architect

Simone Turnone

Year Completed

2023-24